Stormwater BMP Certification

The City has initiated a Stormwater Best Management Practice (BMP) compliance certification program. In 1997 the Common Council adopted an Ordinance requiring BMP maintenance and certification. Stormwater management has been, and continues to be, a high priority for the City. This initiative is intended to improve stormwater runoff in your neighborhood, as well as for the downstream property owners. Residential and Commercial developments are notified prior to final plat or occupancy how the program works and the various requirements.

All stormwater BMP(s) must be inspected and certified, by a State of Wisconsin Professional Engineer or Registered Land Surveyor, to certify that the BMP(s) complies with the original design standards.  The owner is responsible for the proper maintenance and operation of the BMP(s).  This certification ensures that the stormwater ponds are operating as designed to limit pollutant transport and flooding of down stream properties and area waters.

Completed BMP Compliance Reports can be sent to engineering@ci.mequon.wi.us.

Contact - Cole McCraw, Assistant City Engineer (262) 236-2957 with any questions.