Tamerlane Drive Sanitary Lift Station “O” Parallel Force Main Project

In the summer-fall of 2023, the City of Mequon is planning to construct a parallel  sanitary force main in County Line Road from Tamerlane Drive to Granville Road.  Vehicular Detours are anticipated to allow work shaft construction.   Traffic detours are planned to route vehicles along from Swan Road to Donges Bay Road and to Granville Rd.  This work includes approximately 2400 linear feet of 8-inch dia. sanitary force. The construction is anticipated to take 45 working days, and sewer service will not be interrupted. 

This sewer work is part of the capital improvement plan where capacity improvements are strategically being made throughout the City to provide reliable sewer service.  This sanitary sewer force main work will use a trenchless technology to minimize pavement impacts and disruption to your travels along County Line Road. However, roadway cuts are required near the lift station at Tamerlane Drive, in addition to road cuts for jacking pits to cross underneath the Little Menomonee River, and to make a connection at Granville Road.

Traffic control devices will be installed and a temporary flow control may be required, so please travel safely through the construction area.  The project site will be restored in kind and the project will be supervised by a City inspector for the duration of the project. Please do not remove any utility marking flags or paint marks until this work is completed to help facilitate the work and for worker safety.  Traffic control measures and detours are required for everyone’s safety and may cause minor delays so please be patient with the progress of our infrastructure project and please travel safely through the construction area.